Our Trust With TJPS:
NECAS Automation is authorized to carry out Toshiba's Tosmap series DCS Integration on following Principles and guidelines:
-
All Panel Design and Integration shall be strictly as per TJPS design and standard
-
Integration and testing shall be performed under the guideline and supervision of TJPS.
- The Bought out items (BOI's) shall be strictly as per TJPS design and standard.
-
Testing of Panels shall be strictly as per TJPS standard practice.
NECAS has executed following prestigious Projects for TJPS:
Balingasag Project- 3 x 55MW Thermal Power Plant Project ,Philippines
Anpara Project-1x500MW Anpara B Thermal Power Station Unit 5 ,-U.P.